From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
OBJECTIVE: |
Nearly 20 years experience in the
wireless/telecom industry overseeing all aspects of site construction from
field technician into project management and administration. |
|
EXPERIENCE: |
8/2012 - 8/2015 |
Managed Staffing for AT&T |
|
|
Industry: |
|||
|
|
|||
|
Conduct systematic financial
audits to minimize vendor overcharging and overbilling, utilizing experience
in cell site acquisition and civil project development, communications
equipment installation, contracts, work performance measurement, field PM tracking,
cost and project timeline analysis, AT&T network system access and
project cost estimating. Verification of proper supporting documentation and
photographs using Siterra, FileNet, Oracle, Norad, NICAT, Cingulink, CASPR,
and Treev. Conduct training for Supporting Auditors on NICAT 2.0 Audit
environment. Conduct conference call meetings on both a local and national
level between upper management and vendors regarding audit findings, driver
usage and reconciliation of findings. Work on Special projects per Area
Manager Request, Fill-in for other VCCI when out of office or on vacation. |
|||
|
5/2012 - 8/2012 |
Kineticom/General Dynamics |
||
|
Industry: |
|||
|
|
|||
|
Prepared for beginning of project
by determining Build out Material lists (BOMs) and ordering materials, going
over drawings and doing pre-construction site walks to determine the best way
to build a site, supervise work being done at sites. |
|||
|
8/2008 - 8/2011 |
Goodman Networks |
||
|
Industry: |
|||
|
|
|||
|
Oversee projects from start to
finish including pre-construction walks, GC selection, quality, safety and
standards compliance inspections during construction, site audits with
corrective actions follow-up and closeout paperwork approval and tracking. Supervising
contractors on 100+ sites annually, over various projects. Working with Site
Acquisition team to resolve structural and access issues, troubleshooting RF
issues, coordinate antenna changes from omni-directional antenna to
sectorized and LTE capable antennas. Developing and implementing Method of
Procedure for new construction solutions. Multiple conference call meetings
directly with customer project management regarding scheduling and launch
dates as well as construction delays and quality issues. Oversee other
construction managers on the same project regarding quality and corrective
actions as well as scheduling. Working with UMTS, e911, FTTC, and LTE
projects. |
|||
|
6/2008 - 7/2008 |
Solus Technical/T-moblie |
||
|
Industry: |
|||
|
|
|||
|
Perform sweep tests of cell sites
under construction and provide data to T-Mobile for evaluation. |
|||
|
11/2007 - 1/2008 |
Orin USA/T-Mobile |
||
|
Industry: |
|||
|
|
|||
|
Install, commission and
troubleshoot Nokia 3G Flexi equipment |
|||
|
8/2005 - 1/2007 |
Goodman Networks |
||
|
Industry: |
|||
|
|
|||
|
Technician II - Night
Supervisor.Troubleshoot & remedy problems with Andrews Geometrix E911
equipment. Programming and troubleshooting of Adit, Flexmaster, Kentrox
dsu's. Supervise, dispatch and support night shift technicians. Solve
transport (T carrier) problems for both shifts. Train technicians (both
Andrews and Goodman) as necessary on all equipment. In person and telephone
consultation for all technicians. Daily reports for night shift including
sites visited and hours logged to project manager. True Position Certified.
Working with Cingular Wireless equipment within Ericsson and Nokia
cabinets.Promoted to Project Coordinator 10/06Assist field techs with call
testing, diagnostics, and troubleshooting of Andrews Geometrix and True
Position LMU’s. Track and record all work regarding e911 compliance and
equipment status. Collect and transmit data regarding tech schedules and work
performed. Worked with Siterra and Scout systems. |
|||
|
1/2005 - 8/2005 |
Solectron/Verizon Wireless |
||
|
Industry: |
|||
|
|
|||
|
Handle wireless phone
repairs/warranty work as required at Verizon Wireless retail store using
acterna RF tester and phone flashing software. Experience troubleshooting and
repairing Motorola, Samsung, LG, Nokia, Kyocera, and Audiovox phones. Assist
customers with issues including software and hardware upgrades. |
|||
|
11/2004 - 12/2004 |
Cor-Tek/Motorola |
Elgin, IL |
|
|
Industry: |
|||
|
|
|||
|
Troubleshoot Motorola radio
systems (LS, LS+, HT, Minnow) and repair as necessary. Equipment used: Audio
analyzer, modulation analyzer, spectrum analyzer, oscilloscope and signal
generator. Complete necessary equipment tracking, and repair information paperwork
and update computer database. |
|||
|
8/2004 - 10/2004 |
Auxano Wireless/WFI |
Mt. Prospect, IL |
|
|
Industry: |
|||
|
|
|||
|
Installing & troubleshooting
E911 systems including Andrew’s Geometrix WLS equipment and integrating with
various cellular providers equipment using wiring diagrams, RF cable, and T1
lines. Troubleshoot all installations for problems with RF, fractional T-1
connectivity, GPS connectivity, and various power and cellular problems. |
|||
|
7/2003 - 11/2003 |
TekSystems/T-Mobile |
Chicago,IL |
|
|
Industry: |
|||
|
|
|||
|
Install and troubleshoot Nortel
equipment including S-8000 & S-12000 BTS and T-1 line, perform Sweeps,
load testing, using T-Berd equipment, Sitemaster, Racal, interface with
switch and NOC for troubleshooting and site activation. |
|||
|
7/2003 - 11/2003 |
TekSystems/T-Mobile |
Chicago, IL |
|
|
|
|||
|
Install and troubleshoot Nortel
equipment including S-8000 & S-12000 BTS and T-1 line, perform Sweeps,
load testing, using T-Berd equipment, Sitemaster, Racal, interface with
switch and NOC for troubleshooting and site activation. |
|||
|
5/2003 - 6/2003 |
Indotronix/Motorola |
Schaumburg, IL |
|
|
|
|||
|
Troubleshoot Motorola radio
systems (Dimetra, Enterprise, Iden, Outlaw, Yogi) and do minor repairs as
necessary. Equipment used: Audio analyzer, modulation analyzer, spectrum
analyzer, oscilliscope and signal generator. Complete necessary equipment
tracking, and repair information paperwork and update computer database. |
|||
|
11/2002 - 1/2003 |
Indotronix/Motorola |
Schaumburg, IL |
|
|
|
|||
|
Troubleshoot Motorola radio
systems (Astro, Saber, XTS-5000, XTS-2500) and do minor repairs as necessary.
Equipment used: Audio analyzer, modulation analyzer, spectrum analyzer,
oscilliscope and signal generator. Complete necessary equipment tracking, and
repair information paperwork and update computer database. |
|||
|
3/2002 - 5/2002 |
TekSystems/Sprint |
Schaumburg, IL |
|
|
|
|||
|
Worked on 3G upgrades, changed out
BBX and MCCs. Test equipment upon installation. |
|||
|
9/2001 - 11/2001 |
Tek Systems/Nextel Communications |
Westmont, IL |
|
|
|
|||
|
Configure and install expansion
equipment for Cellular towers. Programming and troubleshooting problems at
cellular tower sites including radio troubles, network systems problems.
Maintain and repair cellular sites with Motorola equipment including base
radios using SiteMaster equipment |
|||
|
12/2000 - 8/2001 |
Thrucomm, Inc |
St. Petersburg, FL |
|
|
|
|||
|
Install and maintain cellular
sites, RF & VSAT equipment and frame-relay circuitry. Wire testing, field
surveys, site analysis, proprietary radio. Analyzing RF environment, finding
sources of interference and resolving interference issues using spectrum
analyzers and triangulation, adding filters, corner shields or changing RF
frequency. |
|||
|
1/2000 - 12/2000 |
Tel Private Communications |
Plainfield, Il |
|
|
|
|||
|
Install, de-install, troubleshoot
and repair satellite equipment and sub-systems such as Hughes model 5000,
5000/3 Okemo, 5000 Multi-cast, 8000, 6000, Type 1, Type 2, High Density
Frame, MTI equipment, Direct PC enterprise edition, CAT-3 & CAT-5 wiring,
Heliax wiring, Audio and video wiring. |
|||
|
8/1998 - 3/1999 |
RDS Communications |
Oswego, Il |
|
|
|
|||
|
Install, troubleshoot and repair
various communication systems including satellite (C-Band, KU-Band, DBS and
Hybrid, with use of spectrum analyzers), phone (25 - 500 pair), PBX
(AT&T, Lucent, Nortel, Merlin), security (frame circuits, open loop, closed
loop, cameras), computer networks (Token Ring, Net-Bui, Microsoft VPN,
TCP-IP, SPX/IPX), and fiber-optic systems (running & testing lines using
Fiber-Cat test equipment) |
|||
|
EDUCATION: |
4/2000 |
Hughes Network Systems Installer
Course |
|
|
|
|||
|
5/1997 |
OSHA 40 hour HAZWOPER |
||
|
|
|||
Nokia 3G Basic Cert. |
|||
|
|
|||
Scout Certification |
|||
|
|
|||
Nokia 3G Flexi Cert. |
|||
|
|
|||
Motorola TBAT |
|||
|
|
|||
|
Took and passed Motorola TBAT
test. |
|||
True Position |
|||
|
|
|||
|
Certified |
|||
|
SKILLS: |
Skill Name |
Skill Level |
Low Voltage Wiring |
Intermediate |
|
networking |
Intermediate |
|
Satellite equipment installation |
Intermediate |
|
Management |
Intermediate |
|
Electronic troubleshooting - board
level |
Intermediate |
|
Electronic Troubleshooting -
General |
Intermediate |
|
|
REFERENCES: |
Reference Name: |
Gary Poytress |
|
Reference Company: |
AT&T Mobility Program Office |
|
|
Reference Title: |
Area Technical Project Mgr. |
|
|
Phone: |
847-248-7510 |
|
|
Type: |
Professional |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||